HAYLO / TRACK RECORD
Power that keeps care moving.
Five projects across Ethiopia, Uganda, Syria, and Lebanon. Built for the wards, classrooms, and communities where dependable power changes what is possible.
05
sites in the archive
04
countries reached
4.3M+
people in hospital catchments
01
Live
2025
Mudula Primary Hospital
Tembaro Special Woreda, Ethiopia
SCOPE
Design / Planning / Monitoring
STAKEHOLDERS
Weema
THE PROBLEM
Mudula Primary Hospital serves over 600,000 people across the Tembaro Special Woreda. An unreliable grid and costly diesel backup left critical devices at risk, while unstable cooling spoiled medicines and power surges regularly burned equipment.
THE SOLUTION
We designed and installed a 73.80 kWp solar system with 104.66 kWh of battery storage across 351 m² of rooftop. The system covers just over half of annual demand, stabilizes voltage for sensitive equipment, and keeps medicine storage at consistent temperatures.
Catchment area: 600,000 • Patients per month: 21,350 • Beds: 45
SYSTEM SIZE
73.80 kWp
NET SAVINGS / 10 YEARS
€281,521
BATTERY SIZE
104.66 kWh
SOLAR SURFACE
351 m²
ANNUAL DEMAND
246.14 MWh
ANNUAL YIELD
131.82 MWh
SOLAR RATIO
51.16%
CO₂ SAVINGS / 10 YEARS
76.05 t
02
Live
2026
Karat Primary Hospital
Konzo region, Ethiopia
SCOPE
Design / Planning / Monitoring
STAKEHOLDERS
ForAfrika
THE PROBLEM
Karat Primary Hospital treats over 7,000 patients each month for a catchment of 700,000 people in southern Ethiopia. Grid outages left the hospital dependent on diesel backup, while unstable power damaged devices and spoiled vaccines.
THE SOLUTION
A 128.00 kWp solar system with 122.80 kWh of battery storage now covers more than half of annual electricity demand. Incubators, surgical equipment, and vaccine refrigeration run on stable power.
Catchment area: 700,000 • Patients per month: 7,004 • Beds: 110
SYSTEM SIZE
128.00 kWp
NET SAVINGS / 10 YEARS
€322,258
BATTERY SIZE
122.80 kWh
SOLAR SURFACE
575 m²
ANNUAL DEMAND
325.27 MWh
ANNUAL YIELD
219.06 MWh
SOLAR RATIO
55.59%
CO₂ SAVINGS / 10 YEARS
963.30 t
03
Live
2026
Idlib University Hospital
Idlib, Syria
SCOPE
Design / Planning / Monitoring
STAKEHOLDERS
SAMS
THE PROBLEM
Idlib University Hospital treats over 7,000 patients each month for a catchment of roughly 2.9 million people. Incubators, ventilators, and vaccine refrigeration relied on grid power and diesel backup, costing around €12,000 a month.
THE SOLUTION
We structured a blended grant and loan financing model and installed a 128.00 kWp solar system across 575 m² of rooftop, targeting the hospital’s most critical wards and generating net savings from day one.
Catchment area: ~2,900,000 • Patients per month: ~7,000 • Beds: 70
SYSTEM SIZE
128.00 kWp
NET SAVINGS / 10 YEARS
€281,521
BATTERY SIZE
—
SOLAR SURFACE
575 m²
ANNUAL DEMAND
863.93 MWh
ANNUAL YIELD
—
SOLAR RATIO
22.73%
CO₂ SAVINGS / 10 YEARS
76.05 t
04
In progress
2026
Anaka General Hospital
Nwoya, Uganda
SCOPE
Design / Planning / Monitoring
STAKEHOLDERS
Empowering Africa
THE PROBLEM
Anaka General Hospital is the main referral center for its region in northern Uganda, treating over 1,000 patients a day with a single ambulance covering the whole area. Grid outages and voltage spikes have burned specialist equipment and spoiled vaccines.
THE SOLUTION
We are installing a 64.80 kWp solar system with a 122.80 kWh battery across 288 m² of rooftop, covering roughly 71% of annual demand. Electric motorbikes for patient transport will cut operating costs further.
Catchment area: 108,032 • Patients per month: 1,055 • Beds: 163 • Annual diesel expenses: €13,800
SYSTEM SIZE
64.80 kWp
NET SAVINGS / 10 YEARS
€155,401
BATTERY SIZE
122.80 kWh
SOLAR SURFACE
288 m²
ANNUAL DEMAND
110.00 MWh
ANNUAL YIELD
115.63 MWh
SOLAR RATIO
70.94%
CO₂ SAVINGS / 10 YEARS
602.10 t
05
Live
2024
Al Manhaj Schools
Tripoli, Lebanon
SCOPE
Design / Planning / Monitoring
STAKEHOLDERS
Al Manhaj, BILD hilft e.V. „Ein Herz für Kinder“
THE PROBLEM
Al Manhaj runs four schools and a disability center in Tripoli, serving children who are mostly Syrian refugees or from low-income Lebanese and Palestinian families. Lebanon’s grid delivers only a few hours of power a day, pushing schools onto expensive diesel and forcing cancelled classes.
THE SOLUTION
We designed, financed, and installed four off-grid solar systems with battery backup, sized to each rooftop and load profile. Removing diesel dependency freed close to $26,400 per school each year for tuition support and higher enrolment.
Ability Center • Dar International School • Darb Al Tabbaneh School • Lycée Modern
SYSTEM SIZE
75 kWp combined
NET SAVINGS / 10 YEARS
€233,900
BATTERY SIZE
91.3 kWh combined
SOLAR SURFACE
—
ANNUAL DEMAND
—
ANNUAL YIELD
—
SOLAR RATIO
—
CO₂ SAVINGS / 10 YEARS
1,300 t
Reliable power is public infrastructure.